Working In The Boise 83713 Today

My assistant and I finished up our current list in Garden City yesterday except for two which are on hold due to system issues. I am sure we will get a lot more in the area before we finish for the season.

Today and tomorrow I will be in the 83713 plugging away on sprinkler blowouts. We currently have around 70 or so sprinkler blowouts to do in the 83713, which I cannot complete in two days, so some will have to wait until our next pass through the area. We are still concentrating on areas that are on city water. Irrigation lines will be fine for quite some time. It takes longer to do a sprinkler blowout on city or well water than those on irrigation because we have to winterize the backflow or vacuum breaker.

I am a little behind on invoicing, but hope to catch a lot of it up this morning before I leave for the day.  I usually try to get them out the day of the service, but I am just too darn tired.  Literally doing faceplants on my keyboard I am so exhausted.  Typical for this time of year where I work every day nonstop until all blowouts are completed, which is usually right before Thanksgiving.  Last year we received so many late requests that I was doing blowouts the first week of December.

Below is our route for the 83713. Click on the map for an enlarged view.

Share Button
Previous Post

Day Two In The Boise 83713 For Sprinkler Blowouts

Next Post

Another Day Of Garden City Before We Move On

Leave a Reply

Your email address will not be published. Required fields are marked *

4 visitors online now
1 guests, 3 bots, 0 members
Max visitors today: 13 at 10:21 pm UTC
This month: 27 at 04-05-2024 07:38 pm UTC
This year: 175 at 03-21-2024 12:48 pm UTC
All time: 175 at 03-21-2024 12:48 pm UTC