We are going to finish our current list of sprinkler blowouts in the 83705 today and then work the 83706 for the remainder of the day and Sunday. If all goes well we will start in the Meridian 83646 on Monday for a few days.
Sprinkler systems on city water take a little longer to do because there is more involved with winterizing backflows and vacuum breakers, finding main and drain valves, and hoping the tubes aren't full of water or dirt and hard to get to. We will get through pressurized irrigation systems at a faster pace because there isn't as much to do on each one.
Streets we have left to do in the Boise 83705 are:
S Berkeley Ln | Zola | Kootenai St |
Camas St | Dorian | Spaulding |
Teton | Hillcrest | Cherry Lane |
We currently have over around 31 sprinkler blowouts on our 83706 list, which, with only a part day today to work on them and the entire day Sunday, we are going to have some that will need to wait until we swing through on our rounds again.